About Us
Our purpose is to protect life, health, property and public welfare through administration and enforcement of building and land use codes. Our jurisdiction is in the unincorporated territory of Conejos County. The towns within Conejos County are their own municipalities with their own rules.
The Land Use Office is responsible for the administration and processing of applications for building permits, all subdivisions of land to include division of land, boundary line adjustments, lot consolidations, lot line revisions, large lot (>35 acres) developments, minor (3-6 lots) subdivisions, major (7 or more) subdivisions, amendments to major subdivisions, re-zoning, special (conditional) use permits, variances, vacation of public way, and other land use cases/matters. Land Use staff manages the Onsite Wastewater Treatment System (OWTS) program, a/k/a septic system. Land Use is the regulating authority under the direction of the Colorado Department of Public Health & Environment Regulation 43 and the Conejos County Board of Health. Many people think that because we are a small rural area, we don’t have rules. It’s quite the contrary and the signs at the entry of Conejos County states “Conejos County is Zoned. Permits are Required” you can’t do whatever you want without a permit. Our motto is “If you don’t know… ask!”
Our goal is to strive to maintain fairness, professionalism, and ethical conduct to all we serve. We support the Good Neighbor Concept to help ensure that our community is safe, enjoyable, and beautiful for everyone who lives, works, and plays in Conejos County.
We look forward to helping with your development needs.
Hours of Operation
Monday - Friday 8am - 4:30pm
Except holidays
Courthouse closes at 4pm.
Contact US
Phone: 719-376-2014 Fax: 719-376-6769
Email: landuse@co.conejos.co.us
Address: PO Box 157, 6683 County Road 13, Conejos, CO 81129
- Linda Deherrera - Land Use Director
Phone: 719-376-2014
Email: linda@co.conejos.co.usMonday through Friday from 8:00 AM to 4:00 PM
It is best to schedule appointments with me so I can give you my full attention.
- Aleesha Goodman - Address Coordinator-Permit Technician
- Pres Romero - Septic and Zoning Inspector-Code Enforcement Officer
- Matt Beckner - Building Inspector
Bulletin Board
Willow Pit 2024 Schedule
Location: East of Manassa on Hwy 142
Time: 9am-2pm | May 11th, June 8th, July 13th, August 10th, September 14th, and October 12th
We accept Yard Waste-Tree Branches <5", Willows, Limbs, Leaves, Shrubbery, and Grasses.
NO HOUSEHOLD TRASH, TIRES, FURNITURE, CONSTRUCTION/DEMOLITION DEBRIS, OR LARGE TREE STUMPS WILL BE ACCEPTED.
Fee: Non-perishable food items will be accepted at entry. (Please no expired food!)
Call Jarret (719) 580-8446 or the Land Use Office (719) 376-2014 if you have any questions.
Resources
Helpful Links
Planning and Zoning Permits
Site Access
Subdivision Processes & Applications
Building Resources
Conejos County Has Adopted The 2018 ICC Building Codes
Effective July 1, 2023 Conejos County has adopted the 2018 Editions of the IRC for Residential Construction, IBC for Commercial Construction, IMC for Mechanical, and the IECC Energy code for both residential and commercial construction.
- International Code Council (ICC) 2018 Model Codes
The ICC has made the model codes available online HERE
- How to apply for a building permit
Step by Step Instructions can be downloaded HERE
You can download our Residential Building App. Checklist HERE
When you submit your completed application, the Building Division staff will give you an approximate date when you can expect to hear from the County. The actual time it takes to receive approval is determined by the clarity and completeness of your application materials, as well as the number of other applications awaiting review. If your submitted documents are complete, accurate and meet all the code requirements, the possibility of your application requiring resubmittal or correction is reduced.
Building Permit Submittals
o Proof of Legal Water
o Proof of Legal Sanitation
o County Driveway Permit or CDOT Access Permit for road and driveway may be required.
o HOA approval must be provided if there is an active HOA.
o Complete set of construction drawingsTo apply online click HERE
- Building Plan Requirements
Building plans are the most critical part in the building process. Code issues can be spotted early preventing many costly mistakes later.
The Building Plan Requirements can be downloaded HERE.
- Construction Design Standards
The Conejos County adopted IRC Table 301.2(1) Climatic and Geographic Design Criteria and can be downloaded HERE
Design Standard 2018:
- Design Standard: 2018
- IBC – International Building Code
- IRC - International Residential Code
- IMC - International Mechanical Code
- IFC - International Fire Code
- IECC - International Energy Conservation Code
- Roof Snow Load:
- 40 PSF
- 50 PSF – Platoro
- 64 PSF – La Manga
- 78 PSF - Cumbres
- Wind Velocity
- IBC – 115 MPH (with 3 second gust wind speed in mile per hour)
- Seismic Zone: 1
- Elevation: 7904 ft. - Conejos
- Elevation: 9876 ft. - Platoro
- Elevation: 10,230 ft. - La Manga
- Elevation: 10,022 ft. - Cumbers
- Frost Depth: 36” (water lines at a minimum of 5’ or 60”)
- Insulation:
- R 10/13 Crawl Space
- Basement Wall R-15/19
- Floor Insulation sufficient to fill the framing cavity, R-19 minimum
- Walls R-20
- Ceiling R-49
- Climate Zone: 6B
- Design Standard: 2018
- Building Inspections
It is up to the permit holder to notify the Building Inspector of any inspections. The Building inspector must be given no less than 24hrs notice of inspection. Each inspection will be done in order as received.
Types of Inspections (R109 of 2018 IRC):
Foundation Inspection. Holes for piers or poles must be checked before fill. All other foundations need to be inspected before pour.
Plumbing & Electrical inspections are done through the state.
Framing/Masonry Inspection. Inspection of framing and masonry construction shall be made after the roof, masonry, framing, firestopping, draftstopping and bracing are in place and after the plumbing and electrical rough inspections have been approved.
Insulation Inspection. Inspection of insulation is made after framing inspection and before final cover-up is done.
Midroof Inspection. Inspection of the layers of roof and underlayment. Must contain all edging, flashing, underlayment and a small percentage of the final layer.
Final Inspection. Final inspection shall be made after the permitted work is complete and prior to occupancy.
Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Building Inspector.
It is up to the permit holder to provide access to and means for inspection of such work.
Permit applications are processed in the order they are received.